Build schedule 2013

From Kostume Kult Wikki
Jump to navigation Jump to search

Camp Build Schedule

Saturday In Reno

TEAM ARRIVING

  • DK
  • Devan
  • Boris
  • Lori
  • Brandon Keevan
  • Isa
  • Kimmy D
  • Mark D
  • Stanley D
  • Thad S.
  • Jen Taves
  • Cris Vergara
  • Amanda Donelan

TASKS

  • Pick up Truck (Potentially)

Staying: Sands Regency Casino Hotel

RENO STORE MAP

Sunday In Reno

  • Home Depot #3304 - Order prepared (2955 Northtowne Lane, Reno,NV 89512 (775)674-2900)
  • Winco (2855 Northtowne Lane, Reno, NV 89512 (775) 331-6966)

Staying:

RENO STORE MAP

Monday

  • Monday Team Arrives on Playa before Noon
  • Placers take us to our village
  • Monday Team maps out the ground, placing flags to delineate the borders of each pod and the placement of all art (DK Lead)
  • Gerlach containers are delivered sometime after 2:00 PM and placed by the early arrival crew
  • Monday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.

Tuesday

  • Team builds the common shade area and the living room areas of the camp
  • Team assembles the playatek for the lounge
  • Team puts down carpet in the lounge
  • Team builds the kitchen out of three carports
  • Team unpacks and inventories the containers

Wednesday

  • Wednesday Team arrived on playa before noon
  • Wednesday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
  • Frontage Build Starts

Thursday

  • Build Showers
  • Build evap ponds
  • Continue Frontage Build

Friday

  • Friday Team arrived on playa before noon
  • Friday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
  • Dome Build (Brandon Keevan) ([Build Key]
  • Finishing frontage projects
  • Build Fence from fence to end of frontage

Saturday

  • Sound and lighting setup (Boris/Ben)
  • Clean and organize kitchen (Brandy)
  • Steps for runway
  • Bike Rack Build
  • Trip to Reno for produce and kitchen food (??)
  • Kostume Tent Build

Sunday

  • Front Porch shade structure
  • Team sets up the racks inside the dome
  • Team sets up flags
  • Team cleans up all the tools and repacks the containers
  • Team completes any and all other tasks that have to be done for the build