Camp Build Schedule
Saturday In Reno
TEAM ARRIVING
- DK
- Devan
- Boris
- Lori
- Brandon Keevan
- Isa
- Kimmy D
- Mark D
- Stanley D
- Thad S.
- Jen Taves
- Cris Vergara
- Amanda Donelan
TASKS
- Pick up Truck (Potentially)
- Home Depot
- Fill propane tanks
- Fill 5-gallon with gas for generator
Staying: Sands Regency Casino Hotel
Sunday In Reno
- Home Depot #3304 - Order prepared (2955 Northtowne Lane, Reno,NV 89512 (775)674-2900)
- Winco (2855 Northtowne Lane, Reno, NV 89512 (775) 331-6966)
Staying: Sands Regency
Monday
- Monday Team Arrives on Playa before Noon
- Placers take us to our village
- Monday Team maps out the ground, placing flags to delineate the borders of each pod and the placement of all art (DK Lead)
- Gerlach containers are delivered sometime after 2:00 PM and placed by the early arrival crew
- Monday Team unloads stuff from NY Truck and from Containers as needed for initial setup day.
- Monday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
Tuesday
- Team builds the common shade area and the living room areas of the camp
- Team assembles the playatek for the lounge
- Team puts down carpet in the lounge
- Team builds the kitchen out of three carports
- Team unpacks and inventories the containers
- Frontage Build Starts (Monday Team)
- Container top Platforms started (Boris team)
- Container stairs started (Boris team)
Wednesday
- Wednesday Team arrives on playa before noon
- Wednesday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
- Frontage Build continues (Monday Team)
- Container top Platforms (Boris team)
- Container stairs (Boris team)
- Build Showers (Thad Team)
- Build evap ponds (Thad Team)
Thursday
- Build Showers (Thad Team)
- Build evap ponds (Thad Team)
- Continue Frontage Build
- Construction of arch pieces with DJ Booth on top (Isa team)
Friday
- Friday Team arrived on playa before noon
- Friday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
- Crafting Dome Build (Brandon Keevan) ([Build Key]
- Finishing frontage projects (Boris and Isa Team)
- Build Fence behind frontage
Saturday
- Sound and lighting setup (Boris/Ben)
- Clean and organize kitchen (Brandy)
- Steps for runway
- Bike Rack Build
- Trip to Reno for produce and kitchen food (??)
- Kostume Tent Build
Sunday
- Front Porch shade structure
- Team sets up the racks inside the Kostume Tent
- Team sets up flags
- Team cleans up all the tools and repacks the containers
- Team completes any and all other tasks that have to be done for the build