Line 40: | Line 40: | ||
* Monday Team maps out the ground, placing flags to delineate the borders of each pod and the placement of all art (DK Lead) | * Monday Team maps out the ground, placing flags to delineate the borders of each pod and the placement of all art (DK Lead) | ||
* Gerlach containers are delivered sometime after 2:00 PM and placed by the early arrival crew | * Gerlach containers are delivered sometime after 2:00 PM and placed by the early arrival crew | ||
* Monday Team unloads stuff from NY Truck and from Containers as needed for initial setup day. | |||
* Monday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in. | * Monday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in. | ||
Line 53: | Line 54: | ||
* Wednesday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in. | * Wednesday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in. | ||
* Frontage Build Starts (Monday Team) | * Frontage Build Starts (Monday Team) | ||
** Container top Platforms | ** Container top Platforms started (Boris team) | ||
** Container stairs | ** Container stairs started (Boris team) | ||
==Thursday== | ==Thursday== | ||
* Build Showers | * Build Showers (Thad Team) | ||
* Build evap ponds | * Build evap ponds (Thad Team) | ||
* Continue Frontage Build | * Continue Frontage Build | ||
** Construction of arch pieces with DJ Booth on top (Isa team) | |||
==Friday== | ==Friday== | ||
* Friday Team arrived on playa before noon | * Friday Team arrived on playa before noon | ||
* Friday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in. | * Friday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in. | ||
* Dome Build (Brandon Keevan) ([[http://2.bp.blogspot.com/_hzbJQp06fiY/TFWJ0bFpDhI/AAAAAAAAAIE/zTLz3BS5mKw/s1600/3vdiagram2.gif|Dome Build Key]] | * Crafting Dome Build (Brandon Keevan) ([[http://2.bp.blogspot.com/_hzbJQp06fiY/TFWJ0bFpDhI/AAAAAAAAAIE/zTLz3BS5mKw/s1600/3vdiagram2.gif|Dome Build Key]] | ||
* Finishing frontage projects | * Finishing frontage projects (Boris and Isa Team) | ||
* Build Fence | * Build Fence behind frontage | ||
==Saturday== | ==Saturday== | ||
Line 80: | Line 82: | ||
==Sunday== | ==Sunday== | ||
* Front Porch shade structure | * Front Porch shade structure | ||
* Team sets up the racks inside the | * Team sets up the racks inside the Kostume Tent | ||
* Team sets up flags | * Team sets up flags | ||
* Team cleans up all the tools and repacks the containers | * Team cleans up all the tools and repacks the containers | ||
* Team completes any and all other tasks that have to be done for the build | * Team completes any and all other tasks that have to be done for the build |
Revision as of 15:26, 28 June 2013
Camp Build Schedule
Saturday In Reno
TEAM ARRIVING
- DK
- Devan
- Boris
- Lori
- Brandon Keevan
- Isa
- Kimmy D
- Mark D
- Stanley D
- Thad S.
- Jen Taves
- Cris Vergara
- Amanda Donelan
TASKS
- Pick up Truck (Potentially)
- Home Depot
Staying: Sands Regency Casino Hotel
Sunday In Reno
- Home Depot #3304 - Order prepared (2955 Northtowne Lane, Reno,NV 89512 (775)674-2900)
- Winco (2855 Northtowne Lane, Reno, NV 89512 (775) 331-6966)
Staying: Sands Regency
Monday
- Monday Team Arrives on Playa before Noon
- Placers take us to our village
- Monday Team maps out the ground, placing flags to delineate the borders of each pod and the placement of all art (DK Lead)
- Gerlach containers are delivered sometime after 2:00 PM and placed by the early arrival crew
- Monday Team unloads stuff from NY Truck and from Containers as needed for initial setup day.
- Monday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
Tuesday
- Team builds the common shade area and the living room areas of the camp
- Team assembles the playatek for the lounge
- Team puts down carpet in the lounge
- Team builds the kitchen out of three carports
- Team unpacks and inventories the containers
Wednesday
- Wednesday Team arrived on playa before noon
- Wednesday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
- Frontage Build Starts (Monday Team)
- Container top Platforms started (Boris team)
- Container stairs started (Boris team)
Thursday
- Build Showers (Thad Team)
- Build evap ponds (Thad Team)
- Continue Frontage Build
- Construction of arch pieces with DJ Booth on top (Isa team)
Friday
- Friday Team arrived on playa before noon
- Friday Team unpacks, sets up their shade structures and tents and general pods and otherwise settles in.
- Crafting Dome Build (Brandon Keevan) ([Build Key]
- Finishing frontage projects (Boris and Isa Team)
- Build Fence behind frontage
Saturday
- Sound and lighting setup (Boris/Ben)
- Clean and organize kitchen (Brandy)
- Steps for runway
- Bike Rack Build
- Trip to Reno for produce and kitchen food (??)
- Kostume Tent Build
Sunday
- Front Porch shade structure
- Team sets up the racks inside the Kostume Tent
- Team sets up flags
- Team cleans up all the tools and repacks the containers
- Team completes any and all other tasks that have to be done for the build